Description:
Bleed valve to prevent oil and water into your equipment
High pressure goes up to 4500psi
Precision pressure gauge for monitoring pressure level
All spare parts use advanced CNC technology
Flexible micro-bore hose for convenient filling
Come with O-rings and other complete accessories
Operation:
1.Familiarize yourself with the operation procedure. Incorrect procedure may cause damage to your pump or personal injury.
2.Connect the pump to your gas cylinder. Connect the cylinder head to the pump according to instructions provided by the gas cylinder.
NOTE:
Please read and understand your gas cylinder manual before operation of this pump.
1.Check the discharge valve screw, make sure it is tight
2.Use both feet floor to ensure the stability of the pump.
3.Place your gas cylinder on a mat (make sure the hose is not kinked). To start, pull the handle bar up fast, and then press it down to pressurize your gas cylinder.
When the pressure is above 10Mpa, it is normal to feel increasingly more difficult to pump. This indicates that the pressure is building up.